18X FURNACE
EXPANSION
We helped our client add eight more furnaces to help with aircraft brake pad manufacturing.
18X Furnace Expansion for Aircraft Brake Pad Manufacturer
Take a look at our 18X furnace expansion project for an aircraft brake pad manufacturer, where we designed and installed equipment for a new two-story addition.

18X Furnace Expansion
- New two-story addition to an aircraft brake pad manufacturing facility.
- Included the installation of (8) new furnaces and the supporting process and facilities equipment.
- Coordinating a new electrical service from the utility was required.
- Facility design included power distribution, grounding, lighting, and communications.
- Fire alarms were installed.
- Industrial, 88,0000 sq. ft., $90MM