18X FURNACE
EXPANSION

We helped our client add eight more furnaces to help with aircraft brake pad manufacturing.

18X Furnace Expansion for Aircraft Brake Pad Manufacturer

Take a look at our 18X furnace expansion project for an aircraft brake pad manufacturer, where we designed and installed equipment for a new two-story addition.

Furnace blueprints

18X Furnace Expansion

  • New two-story addition to an aircraft brake pad manufacturing facility.
  • Included the installation of (8) new furnaces and the supporting process and facilities equipment.
  • Coordinating a new electrical service from the utility was required.
  • Facility design included power distribution, grounding, lighting, and communications.
  • Fire alarms were installed.
  • Industrial, 88,0000 sq. ft., $90MM

Your Manufacturing Facility Partner

BSI Engineering helps you with expansion projects for your manufacturing facility. Contact BSI
or call (513) 201-3100 for more information on what we can do for you.

Contact Us