Case Study
Designing a State-of-the-Art Fulfillment Center for e-Commerce

Introduction
BSI Engineering partnered with a leading e-commerce company to design and construct a world-class, automated fulfillment center. The facility set a new benchmark in logistics efficiency and employee productivity, supporting the company’s growing demands in an increasingly competitive industry.
This 1-million-square-foot facility was designed to be scalable, integrating cutting-edge automation technology while accommodating future expansions. The result was a transformative logistics hub that streamlined operations and provided an enhanced work environment for employees.
Discovery
The client envisioned a world-class facility to serve as a model for future fulfillment centers. Requirements included:
- 1 million square feet of warehouse space with varied rack layouts.
- 200+ dock doors for efficient shipping and receiving.
- Parking accommodations for 800+ employees.
- Integration of automated retrieval systems for faster order processing.
Challenges included balancing the need for automation, safety in vehicle-pedestrian interaction, and ensuring scalability for future expansions.
Research
To ensure the fulfillment center exceeded expectations, BSI Engineering conducted extensive research into industry best practices. This included studying automation technologies, rack configurations, and traffic flow patterns to maximize efficiency. Safety considerations for vehicle-pedestrian interaction were also a major focus.
The team also benchmarked similar facilities across the globe to identify innovations in layout design and logistics optimization. By combining insights from this research with client-specific data, BSI Engineering crafted a blueprint for a facility that balanced technological advancements with operational practicality.

Planning
The planning phase emphasized precision and collaboration, with a focus on designing a scalable and efficient facility. The team developed a comprehensive design that integrated 1 million square feet of storage and racking space with automated retrieval systems. An additional 25,000 square feet was dedicated to employee welfare and administrative functions.
Careful attention was given to logistical flow, including the placement of 200+ dock doors to facilitate shipping and receiving operations. The parking design accommodated over 800 vehicles, ensuring smooth traffic patterns for employees and delivery trucks. Detailed construction documents were prepared to serve as a template for future facilities, providing consistency in the client’s operational approach.

Delivery
Executing the project required meticulous coordination across multiple disciplines. BSI Engineering managed the procurement of critical components such as Siemens PLCs and SIS, High Temperature Custom Electric Heaters, and high-temperature valves. The facilities were equipped with advanced rotary traverse systems, gas analysis system, data acquisition system and high-temperature alloy designs to withstand the extreme conditions of combustor testing.
The construction process emphasized precision and quality control, with all systems rigorously tested before commissioning. Software programming for facility operation was integrated seamlessly, providing clients with a user-friendly interface for managing testing processes. The result was a pair of world-class test cells delivered on schedule and within budget.


Results
Results
The completed fulfillment center revolutionized the client’s operations. Automated retrieval systems reduced order processing times by 25%, while the optimized layout streamlined shipping and receiving workflows. Employee satisfaction increased by 30% due to modern welfare facilities, including upgraded break rooms and ergonomic office spaces.
The scalable design allowed the client to replicate the facility for future expansion projects, saving significant time and resources. The project not only met immediate operational needs but also positioned the client as a leader in e-commerce logistics.
Reduction in order processing times.
Improvement in employee satisfaction due to enhanced facilities.
Dock doors streamlined shipping and receiving operations.