BSI Engineering partnered with a leading industrial manufacturer to renovate an existing facility and construct a new five-story building to support a complex industrial process. The project required extensive upgrades to utilities and infrastructure, ensuring the client could implement advanced equipment and workflows while meeting strict safety standards.

This transformation enabled the client to adopt cutting-edge technologies and achieve new levels of efficiency and productivity in their operations.

Discovery

The client required substantial facility upgrades to support a new industrial process. Challenges included:

  • Renovating a five-story building with outdated infrastructure.
  • Ensuring compliance with modern safety and industrial codes.
  • Accommodating new equipment with significant space and utility demands.

Research

To ensure the project’s success, BSI Engineering undertook in-depth research into the client’s operational requirements and industry best practices. This included analyzing equipment specifications, utility demands, and process flow to create a tailored design.

Regulatory compliance was a major focus, with detailed evaluations conducted to meet safety, environmental, and industrial standards. Studies on equipment loads, code requirements, and energy efficiency informed the development of a robust plan that balanced performance with sustainability.

Planning

The team developed a meticulous design plan to align with project goals:

  • Facility Renovations: Upgraded utilities, including power distribution, lighting, and fire alarms, for the five-story building.
  • Building Addition: Constructed a new five-story structure to house equipment and support process requirements.
  • Integrated Design: Created layouts for optimal equipment placement and efficient workflows.

Delivery

BSI Engineering managed the construction and renovation phases with precision, ensuring the project was delivered on time and within budget. The five-story building was constructed to exacting specifications, with advanced utility systems installed to support the new industrial process.

The existing facility was upgraded with modernized power and lighting systems, as well as enhanced fire safety measures. Extensive testing and quality control procedures ensured all systems operated flawlessly before commissioning. Close collaboration with the client throughout the project ensured alignment with their operational goals.

Results

Results

The completed facility delivered transformative results for the client. Production efficiency increased by 25%, driven by optimized workflows and advanced equipment integration. Utility capacity was expanded to support future operations, ensuring long-term scalability. Safety compliance was improved, with upgraded fire safety and electrical systems providing enhanced workplace security.

These upgrades positioned the client to adopt new technologies and remain competitive in their industry. BSI Engineering’s expertise and meticulous approach ensured a seamless transition to modernized operations.

29.8k

Sq. ft. of renovated and expanded space.

30%

Boost in production efficiency.

100%

Compliance with industry safety and operational codes.