Case Study
Production Building & Office Expansion for Future Flexibility

Introduction
BSI Engineering partnered with a manufacturing client to renovate and expand their production and office facilities, addressing space constraints and supporting future product line growth. The project involved modernizing existing production areas, creating new spaces for employee welfare, and reconfiguring utilities to support operational scalability.
The outcome was a flexible and future-ready facility that enhanced productivity, streamlined workflows, and provided an improved working environment for employees.
Discovery
The client faced space constraints that hindered production growth and employee workflow. Key challenges included:
- Relocating existing production lines to create room for new ones.
- Renovating warehouse and office spaces to enhance operational efficiency.
- Updating utilities to support potential future expansion.
Research
BSI Engineering conducted a detailed analysis of the client’s production workflows and future operational requirements. This involved studying the existing layout to identify inefficiencies and evaluating the space needed for relocating and adding production lines. Research into best practices for manufacturing facility design helped guide decisions on layouts and utility upgrades.
Additionally, the team assessed employee welfare needs, focusing on creating ergonomic and efficient spaces to enhance productivity and satisfaction. Utility systems, including HVAC, power distribution, and water supply, were also evaluated to ensure the expanded facility could meet future demands.
Planning
A phased design approach ensured minimal disruptions to ongoing operations:
- Renovation Scope: Included a complete overhaul of production and warehouse spaces, employee welfare areas, and loading docks.
- Utility Upgrades: Improved electrical and mechanical systems to support additional production lines.
- Site Enhancements: Redesigned truck traffic flow for better logistics and employee safety.
Delivery
BSI Engineering managed the project’s execution with precision, ensuring minimal disruption to ongoing operations. The production areas were renovated to optimize space utilization, with new production lines seamlessly integrated into the layout. Welfare areas were modernized, providing employees with improved facilities to enhance their daily experience.
Utility upgrades were implemented with care, ensuring compatibility with existing systems while future-proofing the facility for additional expansions. The rework of loading dock areas and truck traffic routes improved logistical efficiency and safety. Regular communication with the client ensured the project was delivered on time and within budget.
Results
Results
The expanded facility resulted in a 20% increase in production efficiency, thanks to optimized layouts and upgraded utilities. Employee satisfaction improved by 25%, driven by the enhanced welfare spaces and better working conditions. The flexible design allowed for the seamless introduction of new product lines, positioning the client for long-term growth.
These improvements not only addressed immediate operational challenges but also provided the client with a facility that could evolve with their business needs. BSI Engineering demonstrated its ability to deliver impactful solutions tailored to complex manufacturing requirements.
Boost in production efficiency.
Improvement in employee satisfaction due to upgraded welfare areas.
Sq. ft. total renovated and expanded space.
Other Projects
Read more success stories
Contact
Ready to transform your vision into reality?
Contact BSI Engineering today to discuss your project needs. Our team of over 250 engineers and designers across 4 Midwest offices is ready to serve you.